Key turn design, 3D drawings, manufacturing drawings, manufacturing, and on-site implementation for a 3000 m2 factory and 140 m2 prefab office project in Şerifali in 2018.
Project duration: 45 days.

Key turn design, 3D drawings, manufacturing drawings, manufacturing, and on-site implementation for a 3000 m2 factory and 140 m2 prefab office project in Şerifali in 2018.
Project duration: 45 days.