Taps Restaurant

Between 2008 and 2010, project implementations were realized with Balıklı Mimarlık company in Asmalı Mescit 560 m2 Suadiye 430m2 Kentplus 360 m2 Hillside Trio 45m2 Project implementations were carried out at its branches.

N.S. Psychology Clinic Project

Design and 3D drawings, as well as manufacturing drawings, were completed for a 146 m2 clinic space located in Maltepe Ritim Istanbul in 2022.

Voice360 Agency

In 2022, the turnkey design, 3D renderings, production drawings, manufacturing, and on-site application of the 350 m² office project located in Ataşehir Metropol Plaza were completed. Project duration: 2 months.

Zem Shelf Factory

Design and 3D drawings as well as manufacturing drawings were made for the 275 m2 office area of the factory located in Gebze in 2022.

Bülent Tüz P.T. Studio Project

In 2020, turnkey design, 3D drawings, manufacturing drawings, manufacturing, and on-site application were completed for the 165 m2 P.T. Studio located in Bostancı. Project Duration: 20 Days.

Enpos Office Project

In 2019, the turnkey design, 3D drawings, manufacturing drawings, production, and on-site application of the 870 m2 Enpos Office Project located in Göztepe Business Istanbul were realized. Project Duration: 35 days.

Artbar Ajans Office Project

The turnkey design, 3D drawings, manufacturing drawings, manufacturing and on-site application of the 172 m2 Artbar Ajans Office Project located in Kozyatağı Yazgan Business Center was realized in 2019. Project Duration: 32 Days

Lodamaster Şerifali Office Project

The design and implementation of the Lodamaster Şerifali office located in Istanbul were completed in 2021. The project included the design of the office space, 3D drawings, construction drawings, manufacturing, and on-site implementation. Project Duration: 20 Days.

Lodamaster Gebze Factory Project

Key turn design, 3D drawings, manufacturing drawings, manufacturing, and on-site implementation for a 3000 m2 factory and 140 m2 prefab office project in Şerifali in 2018. Project duration: 45 days.

PosMedia Office Project

In 2018, the turnkey design, 3D renderings, production drawings, manufacturing, and on-site application of the 210 m² office project located in Şerifali were completed. Project duration: 9 days.