Renault Kıyı Automotive Showroom

In 2009, the project implementation of 2350 m2 Office Project in Kurtköy was realized with Alaz Construction Company. Project Duration: 3 Months

Mutlu Akü Showroom

In 2020, new concept design and 3D drawings and manufacturing drawings were made for Mutlu Akü Headquarters and planned Branches.

Özlem Saat

In 2013, turnkey design, 3D drawings, manufacturing drawings, manufacturing and on-site implementation of the 18 m2 Store Project in Kurtköy were realized. Project Duration: 10 Days

Rossmann Display Stands and Counters

Since 2015, Color Cosmetics, Imported Perfume, Ideenwelt Stand, EDT Stand, Enerbio Stand, Isana Stand, Cash Counter, Display Stands and different showcase equipment have been manufactured and assembled on site in all Rossmann Stores (140 Stores) in various areas throughout Turkey.

Rossmann Meydan Shopping Mall Store Project

In 2017, turnkey design, 3D drawings, production drawings, manufacturing drawings, manufacturing and on-site implementation were realized for the 300 m2 Store project located in Meydan Shopping Mall.

Rossmann Üsküdar Store Project

In 2011, turnkey design, manufacturing and on-site implementation of the 720 m2 Store Project in Üsküdar was realized. Project Duration: 17 Days