The design, 3D renderings, production drawings, manufacturing, and on-site application for the 142 m² villa project located in Taşevler Site, Şile, Istanbul have been completed.
Project duration: 2 months.

The design, 3D renderings, production drawings, manufacturing, and on-site application for the 142 m² villa project located in Taşevler Site, Şile, Istanbul have been completed.
Project duration: 2 months.